Melbourne: Steelvision has successfully opened a new production facility in Braeside, Victoria. The site will perform a number of activities, including manufacturing and fabricating, along with testing and commissioning of automated products.
The 1077m2 facility will manufacture our Correction and Architectural product ranges along with the Lift and Tilt Operable Windows. The facility will also be used for factory glazing.
Steelvision has resources dedicated to quality control to ensure we meet customer expectations every time. We design project specific inspection and test plans in the facility to ensure we capture and check project critical elements. – David Gooley, Managing Director


Comments are closed.